Roadworks and traffic interruptions Update 7 April 2016

Roadworks and traffic interruptions which are about to start either today or tomorrow in Formby and Hightown.
Massams Lane, Formby, Sefton Council
07 April — 11 April
Delays likely Traffic control (two-way signals)
Works location: At Lighting Column 11 60 58 Formby Sefton Council
Works description: '100mm (2 Layers Of 50mm), 10mm Ac Close, Bs En13108-01 In Carriageway' '70mm (2x 35mm Layers)Of 10mm Ac Close Bs En13108-1 In Footway'
Responsibility for works: Sefton Council
Current status: Planned work about to start
Victoria Road, Formby, Sefton Council
07 April — 07 April
Delays likely Traffic control (multi-way signals)
Works location: At Freshfield Level Crossing
Works description: Survey Works, Dual Jet Washing And Cctv Inspection At The Level Crossing. 00:01 - 05:30.
Responsibility for works: Network Rail Infrastructure Ltd
Current status: Advanced planning
Alt Road, Formby, Sefton Council
07 April — 11 April
Delays possible Some carriageway incursion
Works location: Outside House Number 112 Formby Sefton Council
Works description: '100mm (2 Layers Of 50mm), 10mm Ac Close, Bs En13108-01 In Carriageway'
Responsibility for works: Sefton Council
Current status: Planned work about to start
Harington Road, Formby, Sefton Council
08 April — 12 April
Delays possible Some carriageway incursion
Works location: In Footway Outside Number 15
Works description: Install External Water Meter And Boundary Box At Depth Of Under 1.5 Metres With Minimum Dig With Permanent Reinstatement
Responsibility for works: United Utilities Water
Current status: Planned work about to start
Paradise Lane, Formby, Sefton Council
07 April — 11 April
Delays possible Some carriageway incursion
Works location: Opp & O/S74
Works description: Drainage
Responsibility for works: Sefton Council
Current status: Planned work about to start
Firs Crescent, Formby, Sefton Council
08 April — 19 April
Delays unlikely No carriageway incursion
Works location: Column 7, Outside 11 Formby
Works description: 'Removal Of Electricity Supply From Redundant Street Furniture And The Installation Of Supply To Replacement Street Furniture Including The Excavation And Reinstatement Of The Footway' 'Removal Of 5 - 6 Mtr Column'
Responsibility for works: Sefton Council
Current status: Planned work about to start
Glenmarsh Way, Formby, Sefton Council
07 April — 11 April
Delays unlikely Traffic control (give & take)
Works location: Outside And Opposite 10 - 12
Works description: Install 2 New 25mm Pe Connections To 90mm Pe Main (Long Side)
Responsibility for works: United Utilities Water
Current status: Planned work about to start
Hazlehurst Close, Formby, Sefton Council
07 April — 11 April
Delays unlikely Some carriageway incursion
Works location: Near Lighting Column 2 Formby Sefton Council
Works description: '70mm (2x 35mm Layers)Of 10mm Ac Close Bs En13108-1 In Footway'
Responsibility for works: Sefton Council
Current status: Planned work about to start
Holmwood Drive, Formby, Sefton Council
08 April — 19 April
Delays unlikely No carriageway incursion
Works location: Column 2, Outisde 6, Column 3, Outside 11, Column 5 Outside 25
Works description: 'Removal Of Electricity Supply From Redundant Street Furniture And The Installation Of Supply To Replacement Street Furniture Including The Excavation And Reinstatement Of The Footway' 'Removal Of 5 - 6 Mtr Column'
Responsibility for works: Sefton Council
Current status: Planned work about to start
Kirkstall Drive, Formby, Sefton Council
08 April — 12 April
Delays unlikely Some carriageway incursion
Works location: In Footway Between Number 11 & 12
Works description: Install External Water Meter And Boundary Box At Depth Of Under 1.5 Metres With Minimum Dig With Permanent Reinstatement
Responsibility for works: United Utilities Water
Current status: Planned work about to start
New Road, Formby, Sefton Council
08 April — 19 April
Delays unlikely Some carriageway incursion
Works location: Column 1, Front Right Of 'Office Supplies' Formby Sefton Council
Works description: 'Removal Of Electricity Supply From Redundant Street Furniture And The Installation Of Supply To Replacement Street Furniture Including The Excavation And Reinstatement Of The Footway' 'Installation Of 5 Mtr Column' 'Removal Of 5 - 6 Mtr Column'
Responsibility for works: Sefton Council
Current status: Planned work about to start
Old Town Lane, Formby, Sefton Council
08 April — 12 April
Delays unlikely Traffic control (give & take)
Works location: 28 Old Town Lane
Works description: Alter And Relay 21m Domestic Service From Main In Footway In Old Townlane
Responsibility for works: National Grid Gas Plc
Current status: Planned work about to start
Rosemary Lane, Formby, Sefton Council
08 April — 19 April
Delays unlikely Some carriageway incursion
Works location: Column 13, Outside Holy Trinity Church Formby Sefton Council
Works description: 'Removal Of Electricity Supply From Redundant Street Furniture And The Installation Of Supply To Replacement Street Furniture Including The Excavation And Reinstatement Of The Footway' 'Installation Of 5 Mtr Column' 'Removal Of 5 - 6 Mtr Column' Transfer 20mph Sign
Responsibility for works: Sefton Council
Current status: Planned work about to start
St Georges Road, Formby, Sefton Council
08 April — 12 April
Delays unlikely Some carriageway incursion
Works location: In Footway Outside Number 10
Works description: Install External Water Meter And Boundary Box At Depth Of Under 1.5 Metres With Minimum Dig With Permanent Reinstatement
Responsibility for works: United Utilities Water
Current status: Planned work about to start
Victoria Road, Formby, Sefton Council
07 April — 07 April
Delays unlikely No carriageway incursion
Works location: @Freshfield Station
Works description: Removal Of Cd Display From Footway
Responsibility for works: Street Work Licences
Current status: Planned work about to start
Wicks Green, Formby, Sefton Council
07 April — 11 April
Delays unlikely Some carriageway incursion
Works location: Outside Number 51 In Footway
Works description: Install External Boundary Box At Depth Of Under 1.5 Metres With Minimum Dig With Permanent Reinstatement
Responsibility for works: United Utilities Water
Current status: Planned work about to start
York Road, Formby, Sefton Council
08 April — 12 April
Delays unlikely Some carriageway incursion
Works location: O/S 6-8
Works description: Footway Patching
Responsibility for works: Sefton Council
Current status: Planned work about to start
Information aquired from roadworks.org website which states:
ACCURACY AND LIABILITY: The contents of this web site are for information only. Neither Elgin nor primary data providers accept any responsibility for any loss or damage caused as a result of using the information. Neither Elgin nor the primary data providers warrant the accuracy or timeliness of data displayed on this website. The data is displayed without warranty or commitment of any kind, and to the maximum extent permitted by law, any and all representations, warranties or conditions of any kind whatsoever (including express, implied or statutory warranties of merchantability, fitness for a particular purpose, title, non-infringement, accuracy or satisfactory quality), whether dealing with data or otherwise, are expressly excluded.