Roadworks and traffic interruptions Update 21 March 2016

Roadworks and traffic interruptions which are about to start either today or tomorrow in Formby and Hightown.
Alt Road, Hightown, Sefton Council
22 March — 24 March
Delays possible Some carriageway incursion
Works location: Adjacent To Hightown Pharmacy
Works description: Installation Of Bus Shelter By Merseytravel'S Contractor
Responsibility for works: Sefton Council
Current status: Planned work about to start
Deansgate Lane, Formby, Sefton Council
21 March — 23 March
Delays possible Some carriageway incursion
Works location: Outside Number 18
Works description: Install External Water Meter And Boundary Box At Depth Of Under 1.5 Metres With Minimum Dig With Permanent Reinstatement
Responsibility for works: United Utilities Water
Current status: Planned work about to start
Harington Road, Formby, Sefton Council
21 March — 21 March
Delays possible Some carriageway incursion
Works location: Outside Number 33
Works description: Replace Stop Tap In The Footway On Behalf Of Uu
Responsibility for works: United Utilities Water
Current status: Planned work about to start
Paradise Lane, Formby, Sefton Council
21 March — 01 April
Delays possible Some carriageway incursion
Works location: Column 1a, Side Of 50 Formby
Works description: 'Removal Of Electricity Supply From Redundant Street Furniture And The Installation Of Supply To Replacement Street Furniture Including The Excavation And Reinstatement Of The Footway' 'Installation Of 5 Mtr Column' 'Removal Of 5 - 6 Mtr Column'
Responsibility for works: Sefton Council
Current status: Planned work about to start
Paradise Lane, Formby, Sefton Council
21 March — 01 April
Delays possible Some carriageway incursion
Works location: Column 2a, Rear Of Substation Formby
Works description: 'Removal Of Electricity Supply From Redundant Street Furniture And The Installation Of Supply To Replacement Street Furniture Including The Excavation And Reinstatement Of The Footway' 'Installation Of 5 Mtr Column' 'Removal Of 5 - 6 Mtr Column'
Responsibility for works: Sefton Council
Current status: Planned work about to start
Paradise Lane, Formby, Sefton Council
21 March — 01 April
Delays possible Some carriageway incursion
Works location: Column 3a, Side Of 3 Spymers Croft Formby
Works description: 'Removal Of Electricity Supply From Redundant Street Furniture And The Installation Of Supply To Replacement Street Furniture Including The Excavation And Reinstatement Of The Footway' 'Installation Of 5 Mtr Column' 'Removal Of 5 - 6 Mtr Column'
Responsibility for works: Sefton Council
Current status: Planned work about to start
Raven Meols Lane, Formby, Sefton Council
22 March — 24 March
Delays possible Traffic control (give & take)
Works location: 64 Raven Meols Lane
Works description: Alter And Relay 16m Domestic Service Of Which 3m Is In The Publicfrommain In Raven Meols Lane
Responsibility for works: National Grid Gas Plc
Current status: Planned work about to start
Cable Street, Formby, Sefton Council
21 March — 23 March
Delays unlikely Traffic control (give & take)
Works location: 44 Cable Street
Works description: Self Defect - Internal Core Failure In Footway Trace, Then Excavate To Repair Gas Escape And Reinstate Where Possible
Responsibility for works: National Grid Gas Plc
Current status: Planned work about to start
Derby Road, Formby, Sefton Council
21 March — 01 April
Delays unlikely Some carriageway incursion
Works location: Column 11, Side Of 77-79 Gores Lane Formby
Works description: 'Cut Down Old Column, Excavate For (In Hard Or Soft Ground ) Assemble And Erect Complete 5m Slipper Column, ' 'Luminaire Package, Internal Cabling With ' 'Sub-Fuse, Door To Be Bonded, Surplus Soil & Old Column' 'To Contractors Own Tip.'
Responsibility for works: Sefton Council
Current status: Planned work about to start
Firs Crescent, Formby, Sefton Council
21 March — 01 April
Delays unlikely Some carriageway incursion
Works location: Column 7, Outisde 11 Formby
Works description: 'Removal Of Electricity Supply From Redundant Street Furniture And The Installation Of Supply To Replacement Street Furniture Including The Excavation And Reinstatement Of The Footway' 'Removal Of 5 - 6 Mtr Column'
Responsibility for works: Sefton Council
Current status: Planned work about to start
Heatherways, Formby, Sefton Council
21 March — 01 April
Delays unlikely Some carriageway incursion
Works location: Column 3a, Side Of 20 Formby
Works description: 'Removal Of Electricity Supply From Redundant Street Furniture And The Installation Of Supply To Replacement Street Furniture Including The Excavation And Reinstatement Of The Footway' 'Installation Of 5 Mtr Column' 'Removal Of 5 - 6 Mtr Column'
Responsibility for works: Sefton Council
Current status: Planned work about to start
Holmwood Drive, Formby, Sefton Council
21 March — 01 April
Delays unlikely Some carriageway incursion
Works location: Column 2, Outisde 6 Formby
Works description: 'Removal Of Electricity Supply From Redundant Street Furniture And The Installation Of Supply To Replacement Street Furniture Including The Excavation And Reinstatement Of The Footway' 'Removal Of 5 - 6 Mtr Column'
Responsibility for works: Sefton Council
Current status: Planned work about to start
Holmwood Drive, Formby, Sefton Council
21 March — 01 April
Delays unlikely Some carriageway incursion
Works location: Column 5, Outside 25 Formby
Works description: 'Removal Of Electricity Supply From Redundant Street Furniture And The Installation Of Supply To Replacement Street Furniture Including The Excavation And Reinstatement Of The Footway' 'Removal Of 5 - 6 Mtr Column'
Responsibility for works: Sefton Council
Current status: Planned work about to start
Holmwood Drive, Formby, Sefton Council
21 March — 01 April
Delays unlikely Some carriageway incursion
Works location: Column 3, Outside 11 Formby
Works description: 'Removal Of Electricity Supply From Redundant Street Furniture And The Installation Of Supply To Replacement Street Furniture Including The Excavation And Reinstatement Of The Footway' 'Removal Of 5 - 6 Mtr Column'
Responsibility for works: Sefton Council
Current status: Planned work about to start
Monks Drive, Formby, Sefton Council
22 March — 24 March
Delays unlikely No carriageway incursion
Works location: From O/S 47 To O/S 46
Works description: Remedial Works Following Defect Inspection - To Rework 6mm Patches In Footway, Possible Overbanding Abandon 596.1m X 4'' Si.Lay 596.1m X 90mm Pe Unknown .Allservicesonroute
Responsibility for works: National Grid Gas Plc
Current status: Planned work about to start
Montagu Road, Formby, Sefton Council
21 March — 01 April
Delays unlikely Some carriageway incursion
Works location: Column 1a, Outisde Freshfield Railway Station Formby
Works description: 'Cut Down Old Column, Excavate For (In Hard Or Soft Ground ) Assemble And Erect Complete 5m Slipper Column, ' 'Luminaire Package, Internal Cabling With ' 'Sub-Fuse, Door To Be Bonded, Surplus Soil & Old Column' 'To Contractors Own Tip.'
Responsibility for works: Sefton Council
Current status: Planned work about to start
Information aquired from roadworks.org website which states:
ACCURACY AND LIABILITY: The contents of this web site are for information only. Neither Elgin nor primary data providers accept any responsibility for any loss or damage caused as a result of using the information. Neither Elgin nor the primary data providers warrant the accuracy or timeliness of data displayed on this website. The data is displayed without warranty or commitment of any kind, and to the maximum extent permitted by law, any and all representations, warranties or conditions of any kind whatsoever (including express, implied or statutory warranties of merchantability, fitness for a particular purpose, title, non-infringement, accuracy or satisfactory quality), whether dealing with data or otherwise, are expressly excluded.