Roadworks and traffic interruptions which are about to start either today or tomorrow in Formby and Hightown.
Alt Road, Hightown, Sefton Council
14 March — 16 March
Delays likely Lane closure
Works location: Adjacent To Chemist
Works description: Relocation Of Bus Stop, Including Installation Of Bus Stop Access Kerbs
Responsibility for works: Sefton Council
Current status: Planned work about to start
Kings Road, Formby, Sefton Council
15 March — 17 March
Delays likely Traffic control (multi-way signals)
Works location: Junction Of Duke Street Formby Sefton Council
Works description: '100mm (2 Layers Of 50mm), 10mm Ac Close, Bs En13108-01 In Carriageway'
Responsibility for works: Sefton Council
Current status: Planned work about to start
Three Tuns Lane, Formby, Sefton Council
14 March — 18 March
Delays likely Traffic control (two-way signals)
Works location: Outside 41.
Works description: Works To Excavate Joint Bays In Footway & Road Crossing, Open Cut, To Lay Cable To Meter Position. Followed By Reinstatement.
Responsibility for works: SP Energy Networks
Current status: Planned work about to start
Wrigleys Lane, Formby, Sefton Council
14 March — 30 March
Delays likely Road closure
Works location: Green Lane -Paradise Lane
Works description: Extended Patching
Responsibility for works: Sefton Council
Current status: Planned work about to start
B5424 Ryeground Lane, Formby, Sefton Council
15 March — 17 March
Delays possible Some carriageway incursion
Works location: Lhs From Southport Road
Works description: Footway Patch Rigid
Responsibility for works: Sefton Council
Current status: Planned work about to start
Harington Road, Formby, Sefton Council
15 March — 17 March
Delays possible Some carriageway incursion
Works location: Outside 41 & 37 Formby Sefton Council
Works description: '100mm (2 Layers Of 50mm), 10mm Ac Close, Bs En13108-01 In Carriageway'
Responsibility for works: Sefton Council
Current status: Planned work about to start
Park Road, Formby, Sefton Council
14 March — 16 March
Delays possible Some carriageway incursion
Works location: Junction Of Sanringham Rd Formby Sefton Council
Works description: '100mm (2 Layers Of 50mm), 10mm Ac Close, Bs En13108-01 In Carriageway'
Responsibility for works: Sefton Council
Current status: Planned work about to start
Queens Road, Formby, Sefton Council
14 March — 16 March
Delays possible Some carriageway incursion
Works location: Outside 40 Formby Sefton Council
Works description: '70mm (2x 35mm Layers)Of 10mm Ac Close Bs En13108-1 In Footway'
Responsibility for works: Sefton Council
Current status: Planned work about to start
Windsor Road, Formby, Sefton Council
14 March — 16 March
Delays possible Some carriageway incursion
Works location: Outside Number 39
Works description: Install External Water Meter And Boundary Box At Depth Of Under 1.5 Metres With Minimum Dig With Permanent Reinstatement
Responsibility for works: United Utilities Water
Current status: Planned work about to start
Windsor Road, Formby, Sefton Council
14 March — 16 March
Delays possible Some carriageway incursion
Works location: Junction Of Raven Meols Lane Formby Sefton Council
Works description: '100mm (2 Layers Of 50mm), 10mm Ac Close, Bs En13108-01 In Carriageway'
Responsibility for works: Sefton Council
Current status: Planned work about to start
A565 Moss Side, Formby, Sefton Council
14 March — 16 March
Delays unlikely No carriageway incursion
Works location: Junction Deansgate Lane
Works description: Remedial Works Following Defect Inspection - To Rectify Plant Damage And Kerb Damage In Footway Trace, Then Excavate To Repair Gas Escape And Reinstate Where Possible
Responsibility for works: National Grid Gas Plc
Current status: Planned work about to start
Buckfast Drive, Formby, Sefton Council
14 March — 16 March
Delays unlikely No carriageway incursion
Works location: From Outside 4 To Outside 22
Works description: Remedial Works Following Defect Inspection - To Rework 6mm Patches In Footway, Slurry Seal And Repoint Flags Abandon 334.4m X 4'' Si.33.3m X 2'' St.Lay 33.3m X 40mm,34.2m X 63mm,300.2m X 90mm Pe Unknown.All Services On Route
Responsibility for works: National Grid Gas Plc
Current status: Planned work about to start
Crown Close, Formby, Sefton Council
14 March — 16 March
Delays unlikely Some carriageway incursion
Works location: Outside Number 23
Works description: Install External Water Meter And Boundary Box At Depth Of Under 1.5 Metres With Minimum Dig With Permanent Reinstatement
Responsibility for works: United Utilities Water
Current status: Planned work about to start
Elson Road, Formby, Sefton Council
14 March — 18 March
Delays unlikely Traffic control (give & take)
Works location: 15 Elson Road
Works description: Ater 2m Domestic Service Of Which 1m Is In The Public From Main Infootway In Elson Road
Responsibility for works: National Grid Gas Plc
Current status: Planned work about to start
Greenloons Drive, Formby, Sefton Council
14 March — 16 March
Delays unlikely No carriageway incursion
Works location: 8
Works description: Remedial Works Following Defect Inspection - To Rectify Plant Damage In Footway Trace, Then Excavate To Repair Gas Escape And Reinstate Where Possible
Responsibility for works: National Grid Gas Plc
Current status: Planned work about to start
Hoggs Hill Lane, Formby, Sefton Council
14 March — 16 March
Delays unlikely Some carriageway incursion
Works location: 7 Hoggs Hill Lane
Works description: Lay 8m New Domestic Service Of Which 1m Is In The Public From Main Infootway In Hoggs Hill Lane
Responsibility for works: National Grid Gas Plc
Current status: Planned work about to start
Meols Close, Formby, Sefton Council
14 March — 16 March
Delays unlikely Some carriageway incursion
Works location: Outside Number 9
Works description: Install External Water Meter And Boundary Box At Depth Of Under 1.5 Metres With Minimum Dig With Permanent Reinstatement
Responsibility for works: United Utilities Water
Current status: Planned work about to start
Rosemary Lane, Formby, Sefton Council
14 March — 16 March
Delays unlikely Some carriageway incursion
Works location: Outside Number 8
Works description: Install External Water Meter And Boundary Box At Depth Of Under 1.5 Metres With Minimum Dig With Permanent Reinstatement
Responsibility for works: United Utilities Water
Current status: Planned work about to start
Savon Hook, Formby, Sefton Council
14 March — 16 March
Delays unlikely No carriageway incursion
Works location: From Side Of 25 To Outside 10
Works description: Remedial Works Following Defect Inspection - To Rework 6mm Patches In Footway And Topsoil And Seed Verge Patches Abandon 5.4m X 4'' Ci.63.3m X 4'' Si.Lay 63.3m X90mmpeunknown.Allservices On Route.
Responsibility for works: National Grid Gas Plc
Current status: Planned work about to start
Squirrel Green, Formby, Sefton Council
15 March — 21 March
Delays unlikely Traffic control (give & take)
Works location: 8 Squirrel Green
Works description: Alter And Relay 9m Domestic Service Of Which 1m Is In The Public Frommain In Footway In Squirrel Green
Responsibility for works: National Grid Gas Plc
Current status: Planned work about to start
Information aquired from roadworks.org website which states:
ACCURACY AND LIABILITY: The contents of this web site are for information only. Neither Elgin nor primary data providers accept any responsibility for any loss or damage caused as a result of using the information. Neither Elgin nor the primary data providers warrant the accuracy or timeliness of data displayed on this website. The data is displayed without warranty or commitment of any kind, and to the maximum extent permitted by law, any and all representations, warranties or conditions of any kind whatsoever (including express, implied or statutory warranties of merchantability, fitness for a particular purpose, title, non-infringement, accuracy or satisfactory quality), whether dealing with data or otherwise, are expressly excluded.